An already-twinned section of the Trans Mountain pipeline near Jasper.

An already-twinned section of the Trans Mountain pipeline near Jasper.

Trudeau green lights Kinder Morgan pipeline, rejects Northern Gateway

One of two controversial oil pipelines across B.C. gets green light from federal government



The Trudeau government has approved one controversial B.C. oil pipeline to the Pacific and rejected the second.

The federal cabinet today agreed to accept Kinder Morgan’s proposal to twin the 63-year-old Trans Mountain pipeline to Burnaby, and rejected Enbridge’s Northern Gateway oil pipeline across northern B.C. to Kitimat.

“If I thought this project was unsafe for the B.C. coast I would reject it,” Prime Minister Justin Trudeau said in Ottawa. “This is a decision based on rigorous debate, on science and on evidence. We have not been and will not be swayed by political arguments, be they local, regional or national.”

RELATED: Oilpatch hails approval of Trans Mountain pipeline twinning, Line 3New pipeline review flags tough questions Ex-B.C. Premier urges ‘plan B’ route for pipeline

Trudeau said the decision complements the federal decision, supported by Alberta, to put a national price on carbon to help meet Canada’s international commitment to reduce greenhouse gas emissions.

He also said more pipeline capacity is needed to keep oil from travelling by rail across the country, at greater risk to communities.

“We have made this decision because it is safe for B.C. and it is the right one for Canada.”

Kinder Morgan’s $6.8-billion project would result in a seven-fold increase in tankers running through Vancouver harbour, carrying much more diluted bitumen than in the past.

Trudeau noted it’s the twinning of an existing pipeline that has been in operation since 1953.

In contrast, Northern Gateway would have been an all-new pipeline.

It’s the final nail in the coffin for the Enbridge project, that was widely considered dead in the face of widespread opposition from northwestern B.C. First Nations as well as the B.C. government.

Trudeau said the Great Bear Rainforest is no place for a pipeline and the Douglas Channel is no place for oil tanker traffic.

Enbridge’s $7.9-billion proposal, which had been in the works since 2005, had been conditionally approved by the former Conservative government in 2014, but that green light was overturned by a federal court ruling that the new Liberal government had already decided not to appeal.

The court had found Ottawa failed to meaningfully consult affected First Nations along the 1,177-kilometre route before approving the project.

Trudeau said the Liberal government will also fulfill a campaign promise to legislate a moratorium on crude oil tanker shipments on B.C.’s north coast.

The Kinder Morgan approval sets the stage for a massive confrontation with environmentalists in B.C.

Protesters have already been staging rallies and making preparations for what some believe will be a huge battle, perhaps rivalling the ongoing violent standoff over a pipeline project in North Dakota.

The expansion would triple Trans Mountain capacity to 890,000 barrels per day and result in a seven-fold increase in oil tanker traffic through Burrard Inlet to about 35 a month, which opponents say would greatly increase the risk of an impossible-to-clean spill of diluted bitumen.

Vancouver Mayor Gregor Robertson said he’s “profoundly disappointed” with the decision, calling it a “big step backwards for Canada’s environment and economy.”

Victoria Mayor Lisa Helps said she’s disappointed.

“I just think that the decision to approve the pipeline in the national interest could have equally been a decision to turn down the pipeline in the national interest and investing in green energy and clean energy jobs,” said Helps, who’s been a strong opponent of the expansion.

“It’s a significant increase in tankers going past the coast — very close to Dallas Road. With an increase in traffic, there is an increase in the potential for oil spills and that’s my greatest worry at this point.”

Grand Chief Stewart Phillip, president of the Union of B.C. Indian Chiefs, was concerned the pipeline approval was in trade for Alberta’s support for a national carbon tax.

“We were sold out,” Phillip said. “Trudeau supported (Alberta) Premier Rachel Notley’s agenda at the expense of B.C.’s environmental issues and values.”

He said the strong opposition to pipelines, amonng First Nations and others, won’t dissipate in the wake of the federal decison, adding opponents will block construction if necessary.

“The real battle begins tomorrow morning.”

Environmental groups aim to block any new pipeline to keep Alberta oil from being burned and contributing to climate change, and they were quick to slam the decision, calling it a “betrayal of promises.”

“Canadians — and especially British Columbians have said loud and clear that we don’t want this reckless pipeline coming anywhere near the Pacific coast,” Peter McCartney, Wilderness Committee climate campaigner, said in a statement. “To ignore the deeply held views of the vast majority of people who live on this coast is outrageous.”

McCartney said the tanker ban acknowledges that tankers pose an “enormous” threat to the coast. “If Justin Trudeau agrees that the Great Bear Rainforest is no place for a pipeline, he can’t possibly think that the Salish Sea is better.”

McCartney said more court cases against the projects are expected, and the decision is sure to be an issue in next spring’s provincial election.

REACTION FROM AROUND B.C.PM had ‘no social licence’ to approve Kinder Morgan expansionLangley reaction to pipeline expansion announcement mixedApproval frustrating: Kwantlen First Nation

The cabinet decision follows a ministerial panel review that earlier this fall flagged a series of unresolved questions over the project.

Those included whether the pipeline expansion can be reconciled with the Liberal government’s new climate change commitments, as well as aboriginal rights, particularly in light of Ottawa’s embrace of a UN declaration of indigenous rights.

That panel and other politicians have also urged Ottawa to consider forcing the pipeline’s new twin to bend south to a new terminal, at either Deltaport or Cherry Point in Washington State, to avert an increase in tankers through Burrard Inlet and minimize on-the-ground opposition in Burnaby.

The B.C. government has said the Trans Mountain proposal does not yet meet its five conditions for any new heavy oil pipeline.

Environment Minister Mary Polak said in a statement the province will continue to work to ensure those conditions are met.

She said Ottawa’s recent Oceans Protection Plan has gone further to address B.C.’s requirement for world-leading marine spill prevention and response.

Polak said the project has been under review for several months by the B.C. Environmental Assessment Office, which is soon to report.

“I have every confidence in B.C.’s environmental assessment process.”

Kinder Morgan aims to begin construction in September of 2017 and open the new pipeline in late 2019.

The company says the next steps following the federal approval include seeking all necessary permits, conducting a final cost estimate review with oil shippers who have signed onto the project, and a final investment decision by Kinder Morgan.

The Trudeau government also today approved the Line 3 pipeline upgrade by Enbridge from Alberta to Wisconsin. That $7.5-billion project will increase oil exports from 390,000 to 760,000 barrels per day and could be expanded further to 915,000 barrels.

– with files from Black Press.

NORTHERN GATEWAY INTERACTIVE TIMELINE

Just Posted

FILE – Perry Bellegarde, National Chief of the Assembly of First Nations, takes part in an event on Parliament Hill in Ottawa on Tuesday, July 7, 2020. THE CANADIAN PRESS/Sean Kilpatrick
Indigenous Peoples Day must be a ‘call to action’, says Assembly of First Nations chief

Discovery of children at Kamloops residential school site must lead to change, Perry Bellegarde says

Outside the Kitimat RCMP police station, Diversity Morgan’s family and Kitimat RCMP come together for a pride flag-raising ceremony. (Jacob Lubberts photo)
With heavy hearts, the Kitimat RCMP hosted a pride flag ceremony to highlight the RCMP’s commitment to inclusion and diversification, as well as honouring the passing of 15-year-old transgender student, Diversity Morgan, from Kitimat.
Speeches were given by Staff Sergeant Graham Morgan, Mayor Phil Germuth, Haisla Nation Chief Councillor Crystal Smith, and Diversity’s father, Mike Wilson.
“We are gathered here for the pride flag ceremony, but in my mind, we’re gathered here in solidarity for anyone who’s ever experienced prejudice or discrimination. […] Today we celebrate what makes us all unique individuals,” Mayor Phil Germuth said in his speech at the pride flag ceremony.
Struggling to get the words out, Crystal Smith, Haisla Nation’s chief councillor, emphasized her condolences to Diversity’s family in her speech sharing her similar experiences as well as acknowledging the need for education around these subjects.
Diversity’s father, Mike Wilson, said he wished that everyone was there under different circumstances but was grateful to see the turnout and the support from the community.
In honour of Diversity, the Kitimat RCMP also lowered their Canadian flag to half-mast, to bring awareness for people who are experiencing discrimination and are in need of additional support.
The Kitimat RCMP also stated that they will be lowering their Canadian flag around this time every year as a visual representation of LGBTQ+.
Kitimat Save-On-Foods also donated water and snacks for the ceremony.
Kitimat RCMP host pride flag ceremony in memory of Diversity Morgan

“We’re gathered here in solidarity for anyone who’s ever experienced prejudice or discrimination”

(Haisla First Nation logo)
Haisla Nation host walk for strength and series of virtual sessions for Indigenous History Month

The purpose of the walk is to bring Haisla Nation members together and show their collective support

The District of Kitimat will be awarding business owners with a store front up to $5,000 to cover up to 50 per cent of exterior renovations. (Norhtern Development logo)
The District of Kitimat is awarding $5,000 to storefront owners for exterior renovations

The district has set aside $20,000 this year and non-profits are also eligible

Ron getting loose and sipping a glass of the family’s favourite greek amber spirit, Metaxa. (Photo supplied)
In Our Valley: Ron Lechner

Retired part-time singer and Rio Tinto lifer: Ron Lechner

Marco Mendicino, Minister of Immigration, Refugees and Citizenship during a press conference in Ottawa on Thursday, May 13, 2021. THE CANADIAN PRESS/Sean Kilpatrick
Canada to welcome 45,000 refugees this year, says immigration minister

Canada plans to increase persons admitted from 23,500 to 45,000 and expedite permanent residency applications

Tokyo 2020 President Seiko Hashimoto and IOC President Thomas Bach, on a screen, speak during a five=party online meeting at Harumi Island Triton Square Tower Y in Tokyo Monday, June 21, 2021. The Tokyo Olympics will allow some local fans to attend when the games open in just over a month, Tokyo organizing committee officials and the IOC said on Monday. (Rodrigo Reyes Marin/Pool Photo via AP)
Tokyo Olympics to allow Japanese fans only, with strict limits

Organizers set a limit of 50% capacity — up to a maximum of 10,000 fans

The border crossing into the United States is seen during the COVID-19 pandemic in Lacolle, Que. on February 12, 2021. THE CANADIAN PRESS/Paul Chiasson
Border quarantine to soon lift for fully vaccinated Canadians

Eligible travellers must still take multiple COVID-19 tests

A portion of the George Road wildfire burns near Lytton, B.C. in this Friday, June 18, 2021 handout photo. THE CANADIAN PRESS/HO, BC Wildfire Service *MANDATORY CREDIT*
Blaze near Lytton spread across steep terrain, says BC Wildfire Service

Fire began Wednesday and is suspected to be human-caused, but remains under investigation

Blair Lebsack, owner of RGE RD restaurant, poses for a portrait in the dining room, in Edmonton, Friday, June 18, 2021. Canadian restaurants are having to find ways to deal with the rising cost of food. THE CANADIAN PRESS/Jason Franson
Canadian restaurateurs grapple with rising food costs, menu prices expected to rise

Restaurants are a low margin industry, so there’s not a lot of room to work in additional costs

RCMP crest. (Black Press Media files)
Fort St. John man arrested after allegedly inviting sexual touching from children

Two children reported the incident to a trusted adult right away

Barbara Violo, pharmacist and owner of The Junction Chemist Pharmacy, draws up a dose behind vials of both Pfizer-BioNTech and Oxford-AstraZeneca COVID-19 vaccines on the counter, in Toronto, Friday, June 18, 2021. An independent vaccine tracker website founded by a University of Saskatchewan student says just over 20 per cent of eligible Canadians — those 12 years old and above — are now fully vaccinated. THE CANADIAN PRESS/Nathan Denette
At least 20% of eligible Canadians fully vaccinated, 75% with one dose: data

Earlier projections for reopening at this milestone didn’t include Delta variant

Most Read