Prime Minister Stephen Harper looks down the shoreline in the Arctic port of Nanisivik, Nunavut on August 10, 2007. The construction of a new military refuelling station in the Arctic is facing yet another delay more than 13 years after it was first promised by the federal government. Stephen Harper first announced plans to build the Nanisivik deep-water port in Nunavut along with up to eight armed Arctic patrol vessels in 2007. THE CANADIAN PRESS/Fred Chartrand

Prime Minister Stephen Harper looks down the shoreline in the Arctic port of Nanisivik, Nunavut on August 10, 2007. The construction of a new military refuelling station in the Arctic is facing yet another delay more than 13 years after it was first promised by the federal government. Stephen Harper first announced plans to build the Nanisivik deep-water port in Nunavut along with up to eight armed Arctic patrol vessels in 2007. THE CANADIAN PRESS/Fred Chartrand

COVID-19 blamed as work on military port first promised in 2007 sees new delay

The port was originally supposed to include an airstrip and staffed year-round

The construction of a new military refuelling station in the Arctic is facing yet another delay more than 13 years after it was first promised by the federal government.

Stephen Harper first announced plans to build the Nanisivik deep-water port in Nunavut along with up to eight armed Arctic patrol vessels in 2007.

The long-standing expectation was that the port located on Baffin Island about 20 kilometes from Arctic Bay would be ready when the first of those ships was finally delivered to the Royal Canadian Navy.

Yet while the first Arctic patrol vessel was handed over to the navy on Friday after numerous delays and cost overruns, the Department of National Defence says the Nanisivik facility won’t be ready until 2022.

Defence Department spokeswoman Jessica Lamirande blamed travel difficulties associated with the COVID-19 pandemic for the latest delay, which follows numerous environmental and structural problems over the years.

The port was originally supposed to include an airstrip and staffed year-round, but both plans were dropped after the project’s $116-million budget was found to have more than doubled to $258 million in 2013.

The Canadian Press


Like us on Facebook and follow us on Twitter.

Want to support local journalism during the pandemic? Make a donation here.

Canadian Armed Forces

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

An aerial shot of Cedar Valley Lodge this past August, LNG Canada’s newest accommodation for workers. This is where several employees are isolating after a COVID-19 outbreak was declared on Nov. 19. (Photo courtesy of LNG Canada)
52 positive COVID-19 cases now associated with LNG Canada site outbreak

Eight cases still active, 44 considered recovered

The Kitimat River in July. (Clare Rayment photo)
Good News, Kitimat!

Bringing some local good news to your week

Skeena MLA Ellis Ross has been named critic for Environment and Climate Change Strategy for the BC Liberals. (Peter Versteege photo)
Skeena MLA Ellis Ross named critic for Environment and Climate Change Strategy

Previously, Ross was the critic for LNG, Resource Opportunities, and Responsible Development

Red sky in morning: an early-morning sunrise on May 16, 2020, captured just north of Kitimat. (Eric Roy photo)
Clare’s Corner: Hello, darkness, my old friend

Why does the after-work darkness affect you so much more as an adult than as a child?

A tongue-in-cheek message about wearing a face mask to curb the spread of COVID-19 on a sign outside a church near Royal Columbia Hospital, in New Westminster, B.C., on Sunday, Nov. 29, 2020. THE CANADIAN PRESS/Darryl Dyck
B.C.’s COVID-19 infection count climbs back up to 656

20 more people in hospital, active cases still rising

The Walking Curriculum gets students outside and connecting with nature. (Amanda Peterson/Special to S.F. Examiner)
‘Walking Curriculum’ crafted by SFU professor surges in popularity

The outdoor curriculum encourages students to connect with the natural world

THE CANADIAN PRESS/Nathan Denette
B.C. researchers launch study to test kids, young adults for COVID-19 antibodies

Kids and youth can often be asymptomatic carriers of the novel coronavirus

A sign is seen this past summer outside the Yunesit’in Government office west of Williams Lake reminding visitors and members to stay safe amid the COVID-19 pandemic. (Rebecca Dyok photo)
B.C. First Nation leaders await privacy commissioner decision on COVID-19 information

Release of life-saving data cannot wait, says coalition of First Nations

MLA Jennifer Whiteside is B.C.’s new minister of education. She is speaking out against Chilliwack school trustee Barry Neufeld and asking him to resign. (Black Press)
New education minister calls on Chilliwack trustee to resign

Whiteside echoes former minister’s promise to look at options to remove Barry Neufeld

Peter Beckett. ~ File photo
Supreme Court of Canada to decide if it will hear appeal in 2010 wife murder trial

Peter Beckett has stood trial twice for murder in connection with the death of his wife, Laura Letts-Beckett

Tabor Home in Abbotsford. (Ben Lypka/Abbotsford News)
B.C.’s largest COVID-19 care-home outbreak records 19 deaths, 147 cases

Tabor Home in Abbotsford has been battling outbreak since Nov. 4

Ash and Lisa Van carry a freshly cut Christmas tree while wearing personal protective masks at a Christmas Tree Farm in Egbert, Ontario, Sunday, Nov. 29, 2020 THE CANADIAN PRESS/ Cole Burston
‘Everyone wants a tree and they want it now’: Christmas tree sales on pace for record

Anticipated demand for Christmas trees has sparked a rush by some to purchase more trees wholesale

Most Read